Heavy Transformer Loading & Unloading (< 500 MVA)
Transformers < 500 MVA
Specialized loading, unloading, skidding, and plinth positioning for power transformers under 500 MVA capacity.
- Multi-axle hydraulic trailer to plinth sliding & skidding
- Heavy hardwood sleeper cribbing and timber platform erection
- 100-Ton synchronized hydraulic bottle jacking and lowering
Heavy Transformer Loading & Unloading (> 500 MVA)
Super-Grid > 500 MVA
Ultra-heavy loading, unloading, and precision placement for high-capacity super-grid transformers exceeding 500 MVA.
- Super-heavy (>500 MVA) transformer loading & unloading operations
- Synchronized multi-point 100T to 200T hydraulic power pack jacking
- Turntable rotation and 90° angle direction adjustments on plinths
Transformer Oil Filtration (12,000 LPH, 10,000 LPH / 10 KL & 6,000 LPH Plants)
12,000 LPH, 10 KL & 6,000 LPH Machines
High-vacuum degassing, moisture removal, and BDV restoration using our 12,000 LPH, 10,000 LPH (10 KL), and 6,000 LPH mobile oil filter machines.
- 12,000 LPH, 10,000 LPH (10 KL) and 6,000 LPH high-capacity mobile oil filter machines
- High-vacuum two-stage degassing chamber system
- Integrated VAF electrical meter & digital temperature controllers
Transformer Erection & Substation Assembly
10 MVA to 500 MVA+ Power Transformers
Complete site execution for transformer positioning, erection, radiator assembly, dry air generator air dryer machine, conservator tank & bushing fitting.
- Precision positioning onto transformer plinths and rails
- Assembly of radiators, high-voltage bushings, conservator tanks & OLTC gear
- Air Dryer Machine & Dry Air Generator purging during tank open condition
Air Dryer Machine & Dry Air Generator On-Site Service
Dew Point -60°C Dry Air Purging
Site deployment of heavy-duty Air Dryer Machine & Dry Air Generator (-60°C dew point) during active transformer erection and tank opening.
- On-site deployment & operation of Dry Air Generator / Air Dryer Machine
- Provides continuous oil-free dry air inside transformer tank during erection
- Prevents core/coil moisture contamination during active tank open condition
Transformer Oil Storage Tank & Mobile Vacuum Tank Services
10,000 to 45,000 Liters Tank Capacity
High-capacity mobile oil storage tanks, vacuum tanks, and tanker transfer support for transformer oil filling and filtration.
- High-capacity weatherproof oil storage tanks and mobile vacuum tanks
- Complete flexible hose manifolds, butterfly valves, and oil transfer pumps
- Contamination-free oil storage during transformer repair & internal overhaul
Transformer Commissioning & Oil Testing (BDV & DGA)
BDV > 70 kV Dielectric Testing
Comprehensive pre-commissioning tests, Transformer Oil Breakdown Voltage (BDV) testing, moisture measurement, and DGA oil analysis.
- On-site Transformer Oil BDV (Breakdown Voltage) testing up to 100 kV
- Transformer Oil moisture PPM content measurement & DGA sampling
- Insulation Resistance (IR / Megger) & Polarization Index (PI) testing
Heavy Equipment Handling & Railway Loco Shifting
Up to 200+ Tons
Specialized lifting, shifting, positioning and handling of locomotives, heavy motors, and industrial machinery.
- Railway locomotive engine shifting onto siding tracks
- Multi-point synchronized hydraulic jacking systems
- Heavy hardwood cribbing & steel rail skidding setups
Controlled Loading & Unloading
Multi-Axle Trailer Alignment
Controlled loading, unloading and transportation support for heavy transformers and industrial equipment.
- Trailer-to-plinth hydraulic sliding operations
- Custom timber matting & sleeper platform build
- Hydraulic winch & puller synchronization
H.V. Substation & Switchyard Works
Up to 400kV Switchyards
Site execution and support for H.V. substation, switchyard and associated electrical infrastructure works.
- Gantry & structure mechanical assembly
- Bushing CTs, Surge Arresters & Isolator erection
- Busbar alignment & clamp torquing
EOT Crane & Rigging Operations
Tandem Lift Rigging
Lifting and rigging support for heavy industrial and electrical equipment using suitable equipment and site practices.
- Certified sling, shackle & spreader beam rigging plans
- Indoor turbine hall & compressor building EOT lifts
- Precision blind-lift communication and signaling
Electrical & Mechanical Site Works
Integrated Mechanical & Electrical
Integrated electrical and mechanical support for industrial plants, power projects and infrastructure sites.
- Fan bank & oil cooler piping fabrication
- Flange gasket replacing & leak detection
- Auxiliary panel wiring & interlocking checks
Dismantling & Equipment Relocation
Turnkey Relocation
Safe dismantling, shifting and relocation of transformers, electrical equipment and associated infrastructure.
- Controlled oil draining into mobile tankers/drums
- Bushing & radiator removal with label coding
- Nitrogen gas pressurization for internal dry transport
Railway & Government Infrastructure Works
Railways & PSU Approved
Execution support for railway, government and public infrastructure projects involving electrical, mechanical and heavy equipment operations.
- Railway line plinth sliding & loco engine shifting
- Traction Substation (TSS) transformer erection
- Strict compliance with Railway & Govt Safety Standards