Heavy Transformer Loading & Unloading (< 500 MVA)
Specialized loading, unloading, skidding, and plinth positioning for power transformers under 500 MVA capacity.

Transformer & heavy equipment specialists
Turnkey site execution for power transformers — loading and unloading, substation erection, 12,000 LPH oil filtration, commissioning and BDV testing. Based in Varanasi, mobilising anywhere in India.
Rapid mobilisation from our Varanasi base, anywhere in India
What we do
The work we are called in for most often. Every job is quoted after we understand your site.
Specialized loading, unloading, skidding, and plinth positioning for power transformers under 500 MVA capacity.
Ultra-heavy loading, unloading, and precision placement for high-capacity super-grid transformers exceeding 500 MVA.
High-vacuum degassing, moisture removal, and BDV restoration using our 12,000 LPH, 10,000 LPH (10 KL), and 6,000 LPH mobile oil filter machines.
Complete site execution for transformer positioning, erection, radiator assembly, dry air generator air dryer machine, conservator tank & bushing fitting.
Site deployment of heavy-duty Air Dryer Machine & Dry Air Generator (-60°C dew point) during active transformer erection and tank opening.
High-capacity mobile oil storage tanks, vacuum tanks, and tanker transfer support for transformer oil filling and filtration.
Proof
Photographs and footage from live sites, and the projects we have delivered.
Panipat, Haryana
Handled heavy electrical equipment handling, transformer site positioning, and specialized site execution within active refinery zones.
Petrochemical Complex
Kudgi, Vijayapura, Karnataka
Official site execution video recording capturing live power transformer erection, hydraulic positioning, and high-vacuum transformer oil filtration at NTPC Kudgi Thermal Power Station.
800 MW Super-Critical Power Station
Ambedkar Nagar, Uttar Pradesh
Carrying out transformer erection and oil filtration work for Right Power Transmission & Distribution at NTPC Tanda, including controlled loading, unloading, skidding, and assembly for large power transformers and auxiliary switchyard gear.
Super Thermal Power Site
Call, message on WhatsApp, or send us your site details.
Available 24 hours for site emergencies