Skip to main content
Jagdambe Lift Shift Company Official Logo

Transformer & heavy equipment specialists

Heavy transformer loading, unloading and erection

Turnkey site execution for power transformers — loading and unloading, substation erection, 12,000 LPH oil filtration, commissioning and BDV testing. Based in Varanasi, mobilising anywhere in India.

+91 8112939999

Rapid mobilisation from our Varanasi base, anywhere in India

Oil filtration capacity
12,000 LPH
Heaviest load handled
150T+
Zero-accident record
100%
Trusted on site byIOCL & NTPCIndian RailwaysUPPTCL & State Grid

What we do

Services

The work we are called in for most often. Every job is quoted after we understand your site.

Heavy Transformer Loading & Unloading (< 500 MVA)

Specialized loading, unloading, skidding, and plinth positioning for power transformers under 500 MVA capacity.

Heavy Transformer Loading & Unloading (> 500 MVA)

Ultra-heavy loading, unloading, and precision placement for high-capacity super-grid transformers exceeding 500 MVA.

Transformer Oil Filtration (12,000 LPH, 10,000 LPH / 10 KL & 6,000 LPH Plants)

High-vacuum degassing, moisture removal, and BDV restoration using our 12,000 LPH, 10,000 LPH (10 KL), and 6,000 LPH mobile oil filter machines.

Transformer Erection & Substation Assembly

Complete site execution for transformer positioning, erection, radiator assembly, dry air generator air dryer machine, conservator tank & bushing fitting.

Air Dryer Machine & Dry Air Generator On-Site Service

Site deployment of heavy-duty Air Dryer Machine & Dry Air Generator (-60°C dew point) during active transformer erection and tank opening.

Transformer Oil Storage Tank & Mobile Vacuum Tank Services

High-capacity mobile oil storage tanks, vacuum tanks, and tanker transfer support for transformer oil filling and filtration.

Proof

Our work

Photographs and footage from live sites, and the projects we have delivered.

Panipat, Haryana

IOCL Refinery — Heavy Infrastructure & Equipment Site Support

Handled heavy electrical equipment handling, transformer site positioning, and specialized site execution within active refinery zones.

Petrochemical Complex

Kudgi, Vijayapura, Karnataka

NTPC Kudgi, Karnataka — Erection & Filtration

Official site execution video recording capturing live power transformer erection, hydraulic positioning, and high-vacuum transformer oil filtration at NTPC Kudgi Thermal Power Station.

800 MW Super-Critical Power Station

Ambedkar Nagar, Uttar Pradesh

NTPC Tanda — Transformer Erection & Oil Filtration for Right Power T&D

Carrying out transformer erection and oil filtration work for Right Power Transmission & Distribution at NTPC Tanda, including controlled loading, unloading, skidding, and assembly for large power transformers and auxiliary switchyard gear.

Super Thermal Power Site

Contact us

Call, message on WhatsApp, or send us your site details.

+91 8112939999WhatsApp

Available 24 hours for site emergencies

CallWhatsApp