Our execution process

The step-by-step method our crews follow for a heavy transformer or locomotive shift.

Execution Timeline (16 Steps)
#1
Placement & Rails

Loco Trailer Entering Inside Plinth Zone

Phase Summary

Multi-axle hydraulic heavy trailer maneuvered onto site plinth.

Detailed Execution Procedure

Heavy multi-axle trailer carrying the locomotive/transformer is carefully guided onto the site plinth foundation area under constant ground spotter supervision.

Specialized Equipment Used
  • Multi-Axle Heavy Trailer
  • Ground Spotting Gear
  • Level Steel Plates
Mandatory Safety Protocol

Ground bearing capacity and clearance checks performed.

Step 1 of 16 in Execution Chain